Tel: +86-373-3377988

E-mail: sale@sgycranes.com

75/15Ton Casting Crane Double Beam Bridge Crane

75/15Ton Casting Crane Double Beam Bridge Crane

Casting bridge cranes are the main handling equipment for smelting workshop of steel works.The are used for conveying. pouring and hot metal charging of liquid metal in semlting process. YZS casting bridge crane. adopting main cab and auxiliary cab , and four-girder and four-rail structure,is composed of bridge, main cab, auxiliary cab,connecting traverse,trolley traveling mechanism and electric part.The main cab runs at the rails outside the bridge,and the auxiliary cab runs at the rails inside the bridge.the main cab employs the connecting transverse as the load handling device to hoist steel ladle, and the auxiliary cab, employing the hook as the load handling device, runs across under the main cab to accomplish pouring of molten steel and steel slag,and other auxiliary hoisting in coordination with the main hook.

Send InquiryChat Now
Product Details

75/15Ton casting crane double beam bridge crane


The casting bridge crane is mainly composed of bridge,crab,connecting traverse,trolley mechanism and electric part.The main hook employs the constant –spacing connecting traverse as the load handling device to hoist steel ladle and the auxiliary hook acts in concert with the main hook to accomplish pouring of molten steel slag,and other auxiliary hoisting.

The trolley travelling mechanism and main electric equipment are installed in the girder.The girder’s electric panel room employs rock wool for heat insulation,and has an air cooler inside.To redece heat radiation of molten steel to metal structural members,a thermal baffle is set along the span direction at the bottom of the girder.

The trolley travelling mechanism adopts four-corner drive.

image

This QDY double girder Metallurgy Bridge Crane is mainly used in the place where the molten metal is lifted. The working duty of the complete machine is A7, and thermal protective device is added on the bottom of the main girder.The assembling and test of the crane conform to the document No.ZJBT[2007]375 which was issued by General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China.It can be also used in the place where molten nonmetal material and red-hot solid metal lifting work.Environmental conditions:

 Power supply: 380V/50HZ/3PHASE or on request.The temperature of working environment is -10~+60°C;The relative humidity is less than 50%;

HTB1ySF.dVyZBuNjt_jJ762DlXXaY

包装运输



Hot Tags: 75/15ton casting crane double beam bridge crane, China, manufacturers, suppliers, factory, company, customized, buy, cheap, low price, sale
Related Products
Inquiry