Ladle Overhead Crane For Steel Factory
Overhead crane for steel industry is a special indispensable lifting equipment for continuous casting and continuous hot rolling production line. Overhead crane for steel industry are used to lift molten steel,steel coils,steel material and so on. It consists of bridge, crane travelling mechanism, trolley, electric equipment and electromagnetic carrier beam. Both travelling mechanism and trolley motors are special motors for canes, large starting torque and loading capacity. Difficult loads, reliable and versatile handling functions, high or extremely fluctuating ambient temperatures: the harsh operating conditions in foundries demand high levels of safety and functional reliability for crane systems. The capacity of the crane is up to 550 ton,the span is up to 31m.
Ladle Overhead Crane for Steel Factory
Overhead crane for steel industry is a special indispensable lifting equipment for continuous casting and continuous hot rolling production line.
Overhead crane for steel industry are used to lift molten steel,steel coils,steel material and so on.
It consists of bridge, crane travelling mechanism, trolley, electric equipment and electromagnetic carrier beam. Both travelling mechanism and trolley motors are special motors for canes, large starting torque and loading capacity.
Difficult loads, reliable and versatile handling functions, high or extremely fluctuating ambient temperatures: the harsh operating conditions in foundries demand high levels of safety and functional reliability for crane systems.
The capacity of the crane is up to 550 ton,the span is up to 31m.
It is composed with beam frame, crane travel device, and the trolley with lifting and moving device. There is pave the rail for the trolley moves on the main beam. Assemble the moving table on the outside of the two main beam, one side is prepare for assemble and maintenance the crane move device,another side is prepare for assemble of the trolley conductor device. There are full field of view cab suspend under the main beam, there are joint control desk or single control box packed within the cabin, assemble the sidelong ladder between the cabin and moving table. The main beam joint with the two side end carriage which with the joint point in the middle